Mobile Crane Operations, Level 3, 3rd edition

Published by Pearson (July 16, 2018) © 2019

Products list

Details

  • A print text

This product is expected to ship within 3-6 business days for US and 5-10 business days for Canadian customers.

This exceptionally produced trainee guide features a highly illustrated design, technical hints and tips from industry experts, review questions and a whole lot more! Key content includes: Load Charts, Lift Planning, Telescopic Boom Attachment Assembly and Disassembly, Lattice Boom Assembly and Disassembly, Hoisting Personnel, and Advanced Operational Techniques. 

Instructor Supplements

Instructors: Product supplements may be ordered directly through OASIS at http://oasis.pearson.com. For more information contact your Pearson NCCER/Contren Sales Specialist at http://nccer.pearsonconstructionbooks.com/store/sales.aspx.

Instructor Resources are available for download from www.nccerirc.com

  • Instructor's Resources: 9780135177235
  • TestGen: 9780134898070

Load Charts (35 Hours) Discusses the importance of load charts and charts that apply to different configurations. Includes on-rubber, on-outrigger, jib, and deduction charts, as well as range diagrams and operational notes. Covers parts of line and capacity calculations. (Module 21301)


Lift Planning (30 Hours) Discusses lift plan implementation, including reference information, calculations, single- and multiple-crane lifting, critical lifts, and engineering considerations.(Module 21304)


Telescopic Boom Attachment Assembly and Disassembly (20 Hours) Covers the setup and stowing of swing-away extensions and various jibs, as well as the assembly of intermediate boom sections, on telescopic cranes. Includes the description and operating characteristics of manual and power luffing jibs.(Module 21302)


Lattice Boom Assembly and Disassembly (20 Hours) Identifies lattice-boom components and provides pre-/post-assembly considerations. Provides step-by-step guidance in the assembly and disassembly of lattice booms.(Module 21306)


Hoisting Personnel (20 Hours) Examines ASME B30.23 and 29 CFR 1926.550(g) requirements while presenting advanced operation techniques for hoisting personnel. (Module 21305)


Advanced Operational Techniques(20 Hours) Covers multi-crane lifts, critical lifts, blind lifts, and demolition. Includes sections on how to use magnet and vacuum lifting devices and how to operate a mobile crane in cold weather. (Module 21303)

Need help? Get in touch