(Total Level Hours: 185)
Â
34201-11 Boiler Systems and Components (22.5 Hours)
Introduces the trainee to different boiler configurations and applications. Identifies different boiler components and
explains their functions.
Â
34202-11 Identifying and Installing Valves (20 Hours)
Identifies and explains different types of valves found in boiler systems. Identifies valve components and explains their
functions. Explains how to select, store, handle, and install valves. Also explains how to interpret valve markings and
nameplate information found on valves.
Â
34203-11 Pipe Hangers and Supports (25 Hours)
Identifies pipe hangers and supports found on the job. Explains how to read and interpret pipe support drawings and symbols.
Explains how to select, store, handle, install, and maintain spring can supports.
Â
34204-11 Drawings and Detail Sheets (15 Hours)
Explains how to read blueprints or drawings and their symbols. Explains plot plans, structural drawings, elevation
drawings, as-built drawings, equipment arrangement drawings, P&IDs, isometric drawings, spool sheets, detail sheets, and
orthographic drawings.
Â
34205-11 Fasteners and Anchors (5 Hours)
Covers threaded and non-threaded fasteners and anchoring devices. Explains how to select fasteners and anchors for given
applications. Describes and explains how to install threaded, non-threaded, and insulated fasteners and anchors.
Â
34206-11 Welding Symbols (5 Hours)
Explains the different parts of a welding symbol and how to read symbols on welding drawings, specifications, and welding
procedure specifications. Describes the symbols for fillet welds, groove welds, miscellaneous other welds, and non-destructive
tests.
Â
34207-11 Socket Weld Pipe Fabrication (25 Hours)
Identifies and explains different types of socket weld piping materials and fittings. Explains how to read socket weld piping
drawings. Explains how to determine pipe lengths between socket weld fittings, as well as how to mate socket weld
fittings to pipe.
Â
34208-11 Butt Weld Pipe Fabrication (40 Hours)
Covers preparing pipe ends for butt welding; determining pipe lengths between butt weld fittings; and using welding jigs to
align pipe and butt weld fittings for welding. Explains how to select and install backing rings.
Â
34209-11 Tube Weld Preparation and Fitting (15 Hours)
Describes the various methods used to gain access to boiler tubes needing repair, as well as the methods used to prepare
boiler tubes for replacement. Explains how to fit-up a section of boiler tube. Describes welding procedures for making butt
welds on standard carbon steel tubes and composite tubes.
Â
34210-11 Arc Carbon Arc Cutting and Gouging (12.5 Hours)
Describes air carbon arc cutting (CAC-A) equipment and processes. Explains how to select and install CAC-A electrodes
and how to prepare work area and CAC-A equipment for safe operation. Also provides instructions for using CAC-A equipment
for washing and gouging activities.
Â